Royal Perth D Block

  • 50 Year Whole of Life Model
  • Defects Identification
  • Assessment of Asbestos Roof
  • Beyond Lifecycle Estimates
  • Minor Project Formulation
  • Creation of Asset Register
  • Statutory Requirement Inspection

The project was intended to assess the remaining life of the building and assets within in order to provide a business case for the retention of replacement of the building. This included identifying assets which were beyond their expected life and assessing the potential remaining life, such as of pump sets, package air conditioning units and the backup generator. A detailed assessment was also undertaken of the original asbestos roof covering along with providing estimated costs and project planning for replacement of the roof covering.